Forms Center

By signing in or creating an account, some fields will auto-populate with your information.

Pre-Application Review Submittal Form

  1. Purpose and Intent of Pre-Application Review
    • Review the relevant requirements in the SMC and/or Comprehensive Plan;
    • Establish all documents required for a complete formal application;
    • Identify potential conflicts between the proposed development and applicable regulations; and
    • Introduce the applicant team to applicable City staff members (Planning, Building, and Engineering) and any outside agency representatives.
  2. Pre-Application Review Submittal Requirements

    Conceptual Site Plan. All plans must be drawn at an engineering scale no smaller than one inch equals 30 feet and include a graphic scale and north arrow. The plans shall include the following information, where applicable:

    1. Identifying Information. Name, address, and phone number of the person who prepared the drawing, location of the work, date drawn, and existing parcel number(s).
    2. General Vicinity. General vicinity of the proposed site(s).
    3. Property Limits. Existing and/or proposed lot layout, sizes, dimensions, and setbacks.
    4. Utilities. If possible, the site plan should include existing and/or proposed sewer and water lines, electric, and any additional underground or overhead utilities. The site plan should also include any existing or proposed utility easement(s).
    5. Elevation Contours. Existing elevation contours at intervals no greater than five feet. (Note: This is not required where site relief is less than five feet).
    6. Buildings. Any existing and/or proposed buildings or structures, including those to be demolished if applicable.
    7. Critical Areas. Indicate critical areas and their buffers, if applicable (i.e., streams, floodplain, floodway, wetlands, steep slopes, seismic hazard areas, etc.)
    8. Shoreline Areas. Indicate any shoreline areas (areas regulated by the Snoqualmie Shoreline Master Program), if applicable.
    9. Drainage. Please include conceptual drainage for proposal, including collection, detention, and discharge.
    10. Roadways. Existing and proposed access to site, including adjacent roadways, existing and/or proposed internal road with proposed road widths, and proposed and/or existing parking. The site plan should also include any existing or proposed access easement(s).
    11. Landscaping. Existing and/or proposed landscaping and vegetated areas.

    Building Plan

    1. Floor plans for any proposed buildings and/or structures
    2. Elevations for any proposed buildings and/or structures
    3. Identify occupancy classifications, occupancy loads and types of building construction
    4. If available, provide determination of “allowable” building areas based on occupancy classification and type(s) of construction and any calculated area and/or height increases.
    5. Identify if structure(s) will include sprinkler systems and/or fire alarm systems.

    Questions for Staff. In addition to the information provided above, you may wish to submit a list of key questions or concerns you wish to address with staff during the pre-application review meeting.

     

    Application Filing Fee or Deposit.

    Additional Notes:

    • Pre-application reviews are conducted on Thursdays at either 10:00 am or 1:00 pm.
    • Meetings are typically scheduled within two to three weeks of submitting a complete application.
  3. Leave This Blank: